重构 Wave3 详情与移动体验(05-28-frontend-ux-wave3-business-mobile)

这个提交包含在:
2026-05-29 07:57:17 +08:00
父节点 85c298e25a
当前提交 2b5fd6b1b7
共修改 17 个文件,包含 1087 行新增和 32 行删除
@@ -0,0 +1,4 @@
{"file": ".trellis/spec/frontend/index.md", "reason": "Frontend validation entrypoint."}
{"file": ".trellis/spec/hyb-oa/frontend-react-vite-design.md", "reason": "Required frontend build, visual and mobile/detail checks."}
{"file": ".trellis/spec/hyb-oa/index.md", "reason": "hyb-oa spec entrypoint for governance, fact-source routing and frontend acceptance boundaries."}
{"file": ".trellis/tasks/05-28-frontend-ux-wave3-business-mobile/research/wave3-gap-audit.md", "reason": "Scope and expected checks for Wave3 refresh."}
@@ -0,0 +1,4 @@
{"file": ".trellis/spec/frontend/index.md", "reason": "Frontend task entrypoint and project-specific spec routing."}
{"file": ".trellis/spec/hyb-oa/frontend-react-vite-design.md", "reason": "Wave0-2 shell/header baseline plus detail/mobile surface rules."}
{"file": ".trellis/spec/hyb-oa/index.md", "reason": "hyb-oa spec entrypoint, including product fact-source routing and frontend authority."}
{"file": ".trellis/tasks/05-28-frontend-ux-wave3-business-mobile/research/wave3-gap-audit.md", "reason": "Current Wave3 gap audit and page scope decisions."}
@@ -0,0 +1,53 @@
# Implementation Plan
## Current Decision
This task is a Wave3 refresh after the newer Wave0-2 baseline, not a blank Wave3 rebuild.
## Recommended Implementation Order
1. PC detail surfaces:
- `WorkflowTaskDetailPage`
- `ProjectDetailPage`
- `ContractsRegistryPage`
2. Mobile key surfaces:
- `MobileApprovalsPage`
- `MobileNotificationsPage`
- `MobileReimbursementsPage`
- `MobileReimbursementDetailPage`
- `MobilePurchaseRequestDetailPage` only for deeplink/detail consistency
3. Test baseline:
- update focused Wave3 Playwright spec
- run typecheck/build/design rules/trellis gates
4. Deployment:
- only after user approval
- run trialrun deploy and public checks
## Guardrails
- No backend, schema, permission or workflow-state changes.
- Do not remove existing business actions.
- Do not add a new contract detail route in this task.
- For mobile pages, no desktop tables, no horizontal overflow and no sticky action overlap.
## Completed Implementation
2026-05-29:
- Refreshed PC workflow task detail with a next-action command panel, clearer title/subtitle and evidence-oriented side meta.
- Refreshed PC project detail with a current project command panel covering next action, closure, risk and evidence counts.
- Refreshed PC contract registry with lifecycle summary metrics, expiring-contract command area and ledger row styling.
- Refreshed mobile approvals, notifications, reimbursements, reimbursement detail and purchase detail with mobile focus summaries.
- Cleaned residual forbidden UI copy in Sidebar and Portal home so the UI design rule scan has zero findings.
- Extended `client/tests/e2e/pc-detail-mobile-visual-wave3.spec.ts` to cover project detail, contract registry, mobile reimbursement detail and mobile purchase detail.
## Local Verification
- `cd client && npm run build` passed on 2026-05-29.
- `cd client && npx playwright test tests/e2e/pc-detail-mobile-visual-wave3.spec.ts --workers=1 --reporter=list` passed: 2 tests.
- `node scripts/qa/check-ui-design-rules.mjs` passed with 0 findings.
- `python3 ./.trellis/scripts/task.py validate 05-28-frontend-ux-wave3-business-mobile` passed.
- `node scripts/qa/check-trellis-governance.mjs` passed.
- `git diff --check` passed.
Deployment remains gated by explicit user approval.
@@ -0,0 +1,160 @@
# 前端体验 Wave3 业务详情与移动关键页
## Goal
在已部署的 Wave0-2 全局体验基线之后,复审并补齐 Wave3 业务详情页和移动关键页,让用户从列表、通知、企业微信或移动首页进入具体业务后,仍然看到统一、简洁、可办理的 OA 工作界面。
## What I Already Know
- 用户要求继续推进全站前端体验改进。
- Wave0-2 已完成并部署:全局壳、导航、Topbar、页头基线、登录、工作台、审批中心、报销列表/详情和通知中心已按新基线整改。
- 历史任务 `.trellis/tasks/archive/2026-05/05-27-pc-detail-mobile-visual-wave3/` 已做过一轮 Wave3,但发生在最新 Wave0-2 新基线之前。
- 当前不应重复从零改造,而应做“Wave3 复审与补齐”。
- `frontend-design` 是视觉与交互设计裁决来源。
- 面向用户可测试的页面改动,只有部署和公网检查通过后才可告知用户测试。
## Scope
本任务实施 Wave3 刷新,不改后端业务模型:
- PC 业务详情/详情相邻页面:
- `/workflow/tasks/:taskId`
- `/projects/:projectId`
- `/contracts-registry`
- 移动关键页:
- `/mobile`
- `/mobile/approvals`
- `/mobile/approvals/:taskId`
- `/mobile/notifications`
- `/mobile/reimbursements`
- `/mobile/reimbursements/:reimbursementId`
- `/mobile/purchase-requests/:purchaseRequestId` 作为通知/移动深链一致性补充目标
- 测试与证据:
- 更新或扩展 `client/tests/e2e/pc-detail-mobile-visual-wave3.spec.ts`
- 覆盖 PC 详情、移动列表/详情、企业微信 WebView 关键视口
## Product Direction
- Tone:精密、克制、面向办理的 quiet command surface。
- PC 详情页优先回答:当前是什么状态、我下一步做什么、动作有什么后果、证据在哪里。
- 移动页优先回答:从消息/首页进入后,我是否能少步骤查看、补材料、审批或回到列表。
- 合同和项目相关页面强调:摘要、生命周期、负责人、风险/归档位置,不上传或暴露涉密正文。
## Requirements
### R1. PC 详情页一致性
- 复用 Wave0-2 的全局壳、页头和 detail surface 规则。
- 审批详情强化当前节点、申请摘要、可执行动作、依据/附件、处理历史。
- 项目详情强化项目状态、下一步动作、执行摘要、风险/交付/归档分组,减少局部卡片噪音。
- 合同台账强化生命周期、到期预警、项目关联和导出边界,不新增合同正文存储能力。
### R2. 移动关键路径
- 移动审批列表/详情保持离线、草稿、同步和 sticky action 现有能力;只优化信息层级和操作分组。
- 移动报销列表/详情突出状态、金额、发票/附件完整性和当前可做动作。
- 移动通知保持“事件收件箱”定位,点击应直达业务详情、审批任务或给出可解释提示。
- 企业微信 WebView 场景不得出现 PC 表格、横向滚动、按钮文字挤压或底部操作遮挡内容。
### R3. 文案与操作降噪
- 删除或收纳解释系统实现的文案。
- 保留业务下一步、风险、不可逆操作、敏感附件和导出边界提示。
- 不可用动作要解释原因;高风险动作继续保留确认。
### R4. 验证和发布
- 本地必须通过 typecheck/build 和 focused Playwright。
- 移动/企微相关改动至少覆盖 390x844,并尽量覆盖现有企业微信多视口矩阵。
- 若部署给用户测试,必须跑部署脚本和公网 readiness/只读巡检。
## Implementation Plan
### Step 1. Gap-driven edits
- 不全量重写大页面。
- 优先改页面首屏、状态摘要、命令区、移动详情头和空态/错误态。
- 保留所有现有 API 调用、权限判断、确认弹窗和 mutation 行为。
### Step 2. Shared pattern reuse
- PC 使用 `page-header-shell`、`detail-workspace-grid`、`detail-command-panel`、`detail-fact-grid`、`detail-evidence-card`、`detail-action-stack` 等既有类。
- 移动使用 `mobile-focus-card`、`mobile-command-surface`、`mobile-list-card--focus`、`mobile-list-card--unread`、sticky action 既有模式。
### Step 3. Focused test refresh
- 扩展 `pc-detail-mobile-visual-wave3.spec.ts` 的 mock 页面检查。
- 按影响范围补跑移动入口、企业微信渲染、UI 设计规则和 Trellis 治理检查。
## Acceptance Criteria
- [x] Wave3 gap audit 已记录,且明确区别于历史 Wave3。
- [x] PC 审批详情、项目详情、合同台账完成新基线后的体验补齐。
- [x] 移动审批、移动通知、移动报销及移动深链目标完成新基线后的体验补齐。
- [x] 没有改变后端 API、权限模型、审批状态机、数据库 schema、企业微信配置或公网真实数据。
- [x] `cd client && npm run typecheck` 通过。
- [x] `cd client && npm run build` 通过。
- [x] Focused Playwright 覆盖 Wave3 页面并通过。
- [x] `node scripts/qa/check-ui-design-rules.mjs` 通过。
- [x] `python3 ./.trellis/scripts/task.py validate 05-28-frontend-ux-wave3-business-mobile` 通过。
- [x] `node scripts/qa/check-trellis-governance.mjs` 和 `git diff --check` 通过。
- [ ] 若部署给用户测试,已完成公网部署与公网检查并记录证据。
## Implementation Result
2026-05-29 本地实施完成:
- PC 审批详情新增当前状态/下一步命令区,并保留原审批动作确认、历史和转审能力。
- PC 项目详情新增项目办理焦点,提前展示收口、风险、交付、合同和资料引用边界。
- PC 合同台账改为生命周期台账入口,新增可见合同、生效中、草稿、归档和 30 天到期摘要,不新增合同详情路由或正文上传能力。
- 移动审批、通知、报销列表、报销详情和采购详情新增首屏办理焦点,保留离线草稿、sticky action、原有权限与 mutation 行为。
- 侧边栏和首页去除 UI 规则命中的口语化文案,保持工作台文案更克制。
本地验证完成;公网部署与公网检查待用户单独批准。
## Test Plan
```bash
cd client && npm run typecheck
cd client && npm run build
cd client && npx playwright test tests/e2e/pc-detail-mobile-visual-wave3.spec.ts --workers=1 --reporter=list
node scripts/qa/check-ui-design-rules.mjs
python3 ./.trellis/scripts/task.py validate 05-28-frontend-ux-wave3-business-mobile
node scripts/qa/check-trellis-governance.mjs
git diff --check
```
Deployment gate, only after approval:
```bash
SYNC_ENV=0 LIVE_SMOKE_BASE_URL=https://oa.hyinda.com bash deploy/trialrun/deploy.sh
LIVE_SMOKE_BASE_URL=https://oa.hyinda.com bash scripts/qa/run-live-smoke-readiness.sh
OAOPS1_REPORT_DIR=.trellis/tasks/05-28-frontend-ux-wave3-business-mobile/research/postdeploy-<date>-wave3-public \
LIVE_SMOKE_BASE_URL=https://oa.hyinda.com bash scripts/qa/run-oa-real-use-daily.sh
```
## Out Of Scope
- 不新增合同详情路由或合同正文/附件库。
- 不改后端接口、Prisma schema、审批规则、权限、通知投递、企业微信 OAuth、SMTP 或生产配置。
- 不执行真实付款、ERP 写入、企业微信写入、数据库重置或未授权真实业务写入。
- 不恢复差旅主线能力。
- 不把移动端改造成完整 PC 后台。
## Research References
- `research/wave3-gap-audit.md` — 确认历史 Wave3 已存在,本任务应做新基线后的复审补齐。
- `.trellis/tasks/archive/2026-05/05-27-pc-detail-mobile-visual-wave3/` — 历史 Wave3 范围、实现记录和测试基线。
## Technical Notes
- 重点代码区域:
- `client/src/pages/WorkflowTaskDetailPage.tsx`
- `client/src/pages/ProjectDetailPage.tsx`
- `client/src/pages/ContractsRegistryPage.tsx`
- `client/src/pages/MobileApprovalsPage.tsx`
- `client/src/pages/MobileNotificationsPage.tsx`
- `client/src/pages/MobileReimbursementsPage.tsx`
- `client/src/pages/MobileReimbursementDetailPage.tsx`
- `client/src/pages/MobilePurchaseRequestDetailPage.tsx`
- `client/tests/e2e/pc-detail-mobile-visual-wave3.spec.ts`
@@ -0,0 +1,51 @@
# Wave3 Gap Audit
## Method
- Reviewed archived task `.trellis/tasks/archive/2026-05/05-27-pc-detail-mobile-visual-wave3/`.
- Reviewed current router and target page files under `client/src/pages/`.
- Compared current state against the newer Wave0-2 global shell/header baseline and `frontend-design` direction.
## Important Finding
Wave3 was not truly blank. A previous task already improved PC reimbursement detail, PC workflow detail, PC notifications and several mobile key pages, and added `client/tests/e2e/pc-detail-mobile-visual-wave3.spec.ts`.
This new task should therefore be a **Wave3 refresh after Wave0-2**, not a full rewrite. The goal is to align existing detail/mobile pages with the latest shell/header/navigation language and close visible gaps.
## Candidate Pages
| Page | Current State | Recommended Action |
| --- | --- | --- |
| `/workflow/tasks/:taskId` | Already uses `EntityOverviewHero`, `detail-workspace-grid`, `SectionPanel`, status metrics and action panel. | Light refresh: stronger title/subtitle, next-action wording, evidence/history hierarchy, loading/error polish. |
| `/projects/:projectId` | Rich business page with `EntityOverviewHero` and many panels, but still mixes `card-std`, local metric grids and long sections. | Moderate refresh: introduce clearer current-state/next-step summary and reduce local card noise. |
| `/contracts-registry` | Contract table/list page exists, no dedicated contract detail route found in router. | Treat as contract ledger/detail-adjacent page; improve header, warning summary and lifecycle command area without adding backend routes. |
| `/mobile` | Uses mobile focus card and task list; already covered by mobile entry tests. | Light refresh only if needed for consistency with new copy and entry hierarchy. |
| `/mobile/approvals` and `/mobile/approvals/:taskId` | Large page; already has mobile list/detail surfaces, offline support and sticky action behavior. | Careful targeted refresh: no large rewrite; improve first-screen summary, command labels and detail action grouping. |
| `/mobile/notifications` | Mobile notification inbox exists with filters and direct link behavior. | Align copy and controls with PC notification inbox; avoid adding complexity. |
| `/mobile/reimbursements` | Mobile list already has focus summary and status tabs. | Improve list summary/action wording only; preserve create/delete behavior. |
| `/mobile/reimbursements/:reimbursementId` | Very large detail page with many editing flows. | Targeted polish around state summary, invoice/attachment sections and sticky actions; no business logic rewrite. |
| `/mobile/purchase-requests/:purchaseRequestId` | Existing mobile purchase detail page; useful for notification/deeplink coverage. | Include as secondary target if time permits; do not expand into full procurement redesign. |
## Proposed Scope Decision
Recommended MVP:
1. PC detail refresh:
- workflow task detail
- project detail
- contract registry as contract ledger/detail-adjacent surface
2. Mobile key refresh:
- mobile approvals list/detail
- mobile notifications
- mobile reimbursements list/detail
- mobile purchase request detail only if it is needed to keep deeplink flows consistent
3. Test baseline refresh:
- update or extend `pc-detail-mobile-visual-wave3.spec.ts`
- run mobile route/design checks where relevant
Out of scope:
- No backend API/schema/permission/status-machine changes.
- No new contract detail route unless a separate task approves the product/API design.
- No full mobile rewrite; use focused improvements that preserve existing offline and sticky action behavior.
@@ -0,0 +1,26 @@
{
"id": "frontend-ux-wave3-business-mobile",
"name": "frontend-ux-wave3-business-mobile",
"title": "前端体验 Wave3 业务详情与移动关键页",
"description": "在 Wave0-2 新全局体验基线后,复审并补齐业务详情页与移动关键页体验。",
"status": "in_progress",
"dev_type": null,
"scope": "client/frontend-ux-wave3-business-mobile",
"package": null,
"priority": "P2",
"creator": "shunli",
"assignee": "shunli",
"createdAt": "2026-05-28",
"completedAt": null,
"branch": null,
"base_branch": "main",
"worktree_path": null,
"commit": null,
"pr_url": null,
"subtasks": [],
"children": [],
"parent": null,
"relatedFiles": [],
"notes": "",
"meta": {}
}